Industries

Earthbind® Brown Sites Remediation

Remediating “Brown Sites”, (contaminated soils), into usable land with Earthbind® Stabilizer at a fraction of the cost of current practices.

  1. Excavate the site to the desired depth for  building construction or light duty use.
  2. Onsite crusher to reduce the excavated materials to a 1” minus.
  3. Stockpile or direct load into our computerized pug mill mixer, injecting Earthbind® Stabilizer into the materials.
  4. Using a Visqueen barrior at the bottom of the excavation will assist in enclosing the building pad materials.
  5. Convey the mixed materials to onsite trucks, either run the materials through a paving machine or direct placement for 6”-10” lifts for grading and compaction.

Marshall Stability Testing shows 11,920 psi.

ECONOMICS OF EARTHBIND® VERSES HAUL OFF AND HAUL BACK ON MATERIALS

EXAMPLE:

45,000 Ton Excavation haul off contaminated materials and haul back usable materials.

  • California-Nevada trucking contaminated soils, if they will receive them. Estimate $300.00/ ton, x 45,000 tons=$13,500,000
  • Haul back in usable materials, estimate $30.00/ ton x 45,000 tons= $1,350,000
  • Total estimated cost: $13,850.000 or $330.00/ton.

Process 45,000 tons @3% Earthbind® Stabilizer estimated at $30.00/ ton=$1,350.000

Savings-$12,500.000