Brownfield & Toxic Material Remediation with Earthbind® and Cement Stabilization
Turning contaminated land into stable, safe, and usable ground through advanced on-site stabilization, mixing, and compaction technologies.
The Challenge
Across the U.S., there are more than 450,000 brownfield sites contaminated by hydrocarbons, heavy metals, and other toxins.
Traditional remediation requires expensive hauling, disposal, and import of new materials—costly both financially and environmentally.
Global Stabilization offers a faster, greener, and more cost-effective alternative.
For additional insight into environmental awareness and remediation, read Current Event Report by Mackenzie Coulthard (PDF)
The Solution — Earthbind® + Cement Hybrid Mixing
Our proprietary process combines Earthbind® Stabilizer with Portland cement to create a hybrid material that stabilizes and immobilizes contaminants directly on site.
Using advanced pug mill mixing systems and computerized dosage control, we turn previously contaminated soils into strong, environmentally secure construction bases.
Advantages
- Binds hydrocarbons, heavy metals, and other pollutants
- Reduces haul-off and landfill costs by up to 90%
- Minimizes carbon footprint with on-site processing
- Creates stable, non-leaching material safe for reuse
- Improves worker safety and site productivity
Process Overview
Excavation & Screening – Contaminated material is excavated and screened to 1″ minus.
Pug Mill Mixing – Earthbind® and cement are injected under computer control for precision.
Placement & Compaction – The mixed material is placed in 6–10″ lifts and compacted for stability.
Surface Capping (Optional) – A topical Earthbind® application seals the surface for dust and water control.
This process can be performed in situ or for off-site transport to approved facilities.
Environmental & Safety Benefits
Encapsulates contaminants — prevents leaching
Cuts transportation emissions
Non-toxic, non-corrosive, biodegradable polymer
Enhances air quality by reducing dust and particulates
Complies with OSHA/DEP environmental standards
| Scenario | Tons | Cost per ton | Total cost |
|---|---|---|---|
| Haul off contaminated materials | 45,000 | $300.00 | $13,500,000 |
| Haul back usable materials | 45,000 | $30.00 | $1,350,000 |
| Total cost of conventional method | $14,850,000 | ||
| Process with Earthbind® Stabilizer | 45,000 | $30.00 | $1,350,000 |
| Total cost of Earthbind® Stabilizer method | $1,350,000 | ||
| Savings | $13,500,000 |